Skilled Nursing Facilities

Contents

Actual vs. Planned Service Time Utilization by Shift Report

The Actual vs. Planned Service Time Utilization by Shift report allows you to compare actual vs planned time by discipline and shift to determine whether planned service time values are out of line with actual service times.

  1. Clinical > Reports > Actual vs. Planned Service Time Utilization by Shift.

    • In the Planned Position to Perform Task filter, fields are currently populated with 7.00 but are editable for facility specific FTE hours. This field is configurable on the Admin side.

  • Service Time Tracking must be enabled to use this report.

  • Calculation: Planned Hours minus Actual Hours = Variance. Planned FTEs (Number of FTEs needed to complete Planned Time) minus Actual FTEs (Number of FTEs needed for Actual time documented) = Variance.